Public Works Projects of the Year 2026
Public Works Projects of the Year 2026 Photos
Award winners were announced and presented with a plaque at the 2026 Annual Illinois Chapter Conference Dinner on Wednesday, November 4, 2026. Winners received 3 tickets to the dinner. Project award winner’s photos will be featured on future Chapter publications and the Chapter website.
Overall Public Works Project of the Year 2026
Candlewood Bridge
- Managing Agency: City of Washington
- Engineer: Millennia Professional Services
- Contractor: Illinois Civil Contractors
Technical Innovation (Less than $5 million)
Decision Optimization Technology (DOT)
- Managing Agency: Decision Optimization Technology-United States
- Engineer: Hanson Professional Services, Inc.
Public works agencies must make defensible infrastructure investments despite aging assets, rising service expectations, and constrained budgets. DOT-US helps communities turn complex roadway needs into clear, transparent strategies that direct limited funds toward the greatest public benefit, making it a strong candidate for the Illinois APWA Technical Innovation Award.
Through services supported by DOT™ decision-support tool, DOT-US provides analysis that reveals tradeoffs among funding, risk, roadway condition, and long-term performance. The resulting scenarios, capital plans, forecasts, maps, and visualizations help agencies compare options, establish priorities, explain recommendations, and build confidence among elected officials and residents.
DOT™ is currently helping Illinois communities including the Cities of Peoria, Rockford, Springfield, Bloomington, Pekin, and Washington, IL improve capital planning and asset management practices.
Historical Restoration/Preservation (Less than $5 million)
Candlewood Bridge
- Managing Agency: City of Washington
- Engineer: Millennia Professional Services
- Contractor: Illinois Civil Contractors
The City of Washington’s Candlewood Bridge, a historic double-arch masonry bridge built in 1894 and carries Candlewood Drive over the south branch of Farm Creek. Designed by city engineer Fredrick Rickman in 1893 and built by Jacob Habluetzel, a Stone Mason from Washington, was built using locally sourced stone. It is listed on the National Register of Historic Places and is the only remaining stone arch bridge in Tazewell County supported solely by its arches.
After a wing wall failure closed the bridge in 2023, the city chose rehabilitation rather than replacement to preserve its historic character. The project repaired the wing wall using original masonry where possible, restored the bridge masonry, strengthened structural elements, improved scour protection, and upgraded the roadway and guardrails. The project was completed on time and within budget, reopening to traffic on August 17, 2025. As a result of the successful preservation effort, the City of Washington received an Illinois State Historical Marker.
Environment (Less than $5 million)
Eureka Stormwater Improvements
- Managing Agency: City of Eureka
- Engineer: MSA Professional Services, Inc.
- Contractor: Stark Excavating
This $3.3 million project represents the successful implementation of a long-term community vision first established in the 2014 Flood Reduction and Drainage Plan. The study identified the Valley Court, Hilldale Avenue, Cruger Avenue, and Apostolic Christian Home drainage basin as one of Eureka’s highest-priority flooding areas due to recurring impacts on residential neighborhoods, senior living facilities, local roadways, and public infrastructure.
The city implemented the recommendations by creating a dedicated stormwater utility and strategically using American Rescue Plan Act (ARPA) funding. This approach allowed the city to advance one of the largest drainage improvement projects identified in the master plan.
Transportation (Less than $5 million)
Downs Downtown Streetscape Improvements
- Managing Agency: Village of Downs
- Engineer: MSA Professional Services, Inc.
- Contractor: Knapp Concrete Construction, Inc.
This project was an eight-year community visioning, planning, funding, design, and construction effort that transformed the heart of downtown Downs into a safer, more accessible, and economically vibrant destination. The project originated from goals identified in the Village’s 2018 “Mapping the Future of Downs” Action Plan and advanced through an extensive public engagement process that included a dedicated Downtown Streetscape Steering Committee, a community design survey generating 133 responses, public open houses, public hearings, stakeholder meetings, and coordination with residents, businesses, elected officials, utility providers, and regulatory agencies.
The completed project delivered enhanced crosswalks, ADA-compliant sidewalks and access, curb bump-outs, decorative lighting, stormwater improvements, landscaping, public gathering amenities, and improved parking availability and was funded through a $2.128-million Congressional Community Project Funding grant.
Environment (Less than $5 million)
Winchester Bay Stream Reach 1 Restoration
- Managing Agency: Apple Canyon Lake Owners Assoc.
- Engineer: Baxter Woodman
- Contractor: Baxter Woodman Natural Resources, LLC
The Winchester Bay Stream Reach 1 Restoration Project was a comprehensive stream and riparian restoration initiative completed by the Apple Canyon Lake Property Owners Association (ACLPOA) and Baxter & Woodman Natural Resources in 2025. Located along approximately 2,600 linear feet of stream draining to Winchester Bay of Apple Canyon Lake, the project addressed severe streambank erosion, invasive vegetation, degraded habitat, and nonpoint source pollution identified as priority concerns.
Funded through an Illinois EPA Section 319(h) Nonpoint Source Pollution Control Grant and local contributions, the $565,732 project was completed more than one year ahead of the grant deadline.
Professional Service Management Innovation (Less than $5 million)
Peoria Public Works Engineering
- Managing Agency: City of Peoria
- Engineer: Hanson Professional Services, Inc.
Due to staffing changes in 2020, the City of Peoria’s Public Works Engineering Division partnered with consultants to provide program management services for transportation, stormwater, combined sewer, and construction projects. Acting as an extension of City staff, program managers help identify future projects, develop budgets, oversee consultant performance, manage schedules and invoices, and report to City engineering staff. This flexible approach allows consultants to utilize a range of technical, administrative, and fiscal personnel as needed, helping deliver high-quality projects efficiently, on schedule, and within budget.
Disaster or Emergency Construction/Repair ($5 million, Less than $25 million)
Crawford County Airport Tornado Recovery & Reconstruction
- Managing Agency: Crawford County Airport
- Engineer: Hanson Professional Services, Inc.
- Contractor: K. Wohltman Construction, Inc.
- Contractor: Gensini Excavating, Inc.
Restoring and improving a vital rural transportation asset after an EF-3 tornado devastated the airport near Robinson, Illinois, on March 31, 2023. The storm destroyed hangars, buildings, aircraft and vehicles, leaving only the runways and pavement intact.
Hanson worked with the Crawford County Airport Authority, Illinois Department of Transportation Division of Aeronautics, Federal Aviation Administration, local contractors and community volunteers to restore limited operations and accelerate planning for grant applications. The project team secured a highly competitive FAA grant through the Bipartisan Infrastructure Law Airport Terminal Program. Rather than simply replace what was lost, the team used the recovery as an opportunity to improve the airport’s long-term safety, efficiency, resilience and community value.
The project was completed within 20 months, and restored full operations to support regional business, medical travel and emergency access, and helped Crawford County regain an important economic and community gateway.
Transportation ($5 million, Less than $25 million)
Peoria’s Downtown Two-Way Conversion & Signal Modernization
- Managing Agency: City of Peoria
- Engineer: Hanson Professional Services, Inc.
- Contractor: Otto Baum Company
This Modernization Project transformed two major corridors into a safer, more accessible and economically vibrant transportation network. Building on the success of the 2015 TIGER II Warehouse District project, the initiative extended two-way traffic operations along Adams Street and Jefferson Avenue east through downtown to Interstate 74 while modernizing critical traffic signal infrastructure. The project upgraded 12 intersections, replaced one-way pedestal signals with modern mast arm systems and installed new two-way signal operations at key state route intersections. The improvements included one travel lane in each direction, a center left-turn lane, on-street parking, dedicated bicycle lanes, pedestrian bump-outs, enhanced crosswalks and upgraded pedestrian signal infrastructure designed to improve safety and accessibility.
Through collaboration among the city, consultants, IDOT, utilities, and contractors, the project enhanced safety, mobility, accessibility, and downtown connectivity while supporting continued economic development.
Environment ($5 million, Less than $25 million)
Village of Downs Water Treatment Plant
- Managing Agency: Village of Downs
- Engineer: MSA Professional Services, Inc.
- Contractor: Leander Construction, Inc.
The project required extensive coordination with the Illinois Environmental Protection Agency, Bloomington-Normal Water Reclamation District, equipment suppliers, operators, contractors, and Village leadership. Construction and commissioning were carefully phased to maintain uninterrupted water service while new treatment processes were installed, tested, and placed into operation. Through proactive value engineering, funding management, and partnership with regulatory agencies, the Village secured favorable financing, including approximately $1.25 million in principal forgiveness, maximizing the return on public investment. The completed facility provides reliable, high-quality drinking water, operational resiliency, regulatory compliance, and infrastructure capacity that will serve the community for decades while supporting future economic and residential development.
Transportation ($25 million, Less than $75 million)
City of Pekin Court Streets Complete Streets Corridor Revitalization
- Managing Agency: City of Peoria
- Engineer: Hanson Professional Services
- Contractor: United Contractor Midwest (Stadium – Veterans)
- Contractor: Otto Baum (10th – Stadium)
- Contractor William Charles Construction (8th – 10th St.)
The Great Streets project transformed a former state highway into a modern, multimodal corridor that strengthens mobility, accessibility, safety, and economic vitality. As part of the National Highway System, Court Street serves as Pekin’s primary commercial corridor, connecting businesses, healthcare providers, schools, parks, employment centers, and community destinations throughout the city.
Following the relocation of Illinois Route 9 to a new corridor, the city partnered with Hanson Professional Services to develop and design improvements along Court Street from Eighth Street to Veterans Drive. The project included roadway reconstruction, resurfacing, drainage improvements, traffic signal modernization, utility coordination, and multimodal infrastructure improvements that enhance safety, accessibility, and community connectivity. New sidewalks, ADA- and PROWAG-compliant curb ramps, improved crossings, and upgraded pedestrian facilities replaced deteriorated infrastructure that had created barriers for mobility-impaired users and discouraged walking.